CATEGORY » -Infra-Structure Completed Projects

1st SECTION POTABLE WATER LINE CONSTRUCTION OF BILECIK


Our completed drinking water project consists of works such as totally 24.404 meter CTP and steel pipe in 900 mm diameter, 9.400 meter transmission line made of steel pipe, 2 units of 50 m² and 1 unit of 200 m² tanks, elevation centre with 2 groups, drainage system, vane chamber, emptying and vacuum lifter.

EMPLOYER
İLLER BANKASI GENEL MÜDÜRLÜĞÜ /ANKARA