KIRKUK KHASSA DAMOur dam construction 10 kilometres away from north-eastern part of Kirkuk is constructed for meeting the drinking water and irrigation requirements of the people of Kirkuk. Main dam built on the River Khassa is an earth-fill dam type. The main dam with totally 9 million m³, has a crest height of 58 meters, and length [...] [ More → ] |
TATVAN / FERRYBOAT AND PORT CONSTRUCTION – TATVANOur project that has been already continuing covers building of two ferryboats will 50 wagon capacity to be used to carry wagons between Tatvan-Van and to construct dry docks and ports for them in Van Lake for General Directorate of State Railways (TCDD). Constructions of dry dock: Dry dock in 140 x 28 m sizes [...] [ More → ] |
CONSTRUCTION OF SIVRIHISAR – EMIRDAG HIGHWAYThe highway project still under construction is totally 41 kilometers long, 16 kilometers of this highway is between Sivrihisar – Emirdag at the important part of North-South line and 25 kilometers of this highway is between Emirdag – Cifteler. Project covers earth works, works of art, plant-mix sub base, base, hot mixture with bitumen (BSK) [...] [ More → ] |
CONSTRUCTION OF HIGHWAY OF MARDIN DARGECIT – IDILStill continuing project with the construction is located on the provincial border of Mardin – Şırnak and is totally 34 kilometers long. It will have been opened an important route in the region located under hard geography thanks to this project. The project whose cut excavations are explosion excavation at the rate of 70 % [...] [ More → ] |
CITY CROSSING OF ADILCEVAZ – ERCISOur still continuing project on Adilcevaz-Ercis city crossing highway is also on South Silk Road and for that reason it is important. The highway is 7 kilometers long and will be turned into 2×2 (double) highway. Project covers earth works, works of art, plant-mix sub base, base, hot mixture with bitumen, binder and stone mastic [...] [ More → ] |
CITY CROSSING OF PATNOSThe project still under construction at the city crossing of Patnos and where superstructure is more important, it is aimed to increasing the city crossing standards. Project covers earth works, works of art, plant-mix sub base, base, hot mixture with bitumen, binder and stone mastic asphalt etc. [ More → ] |
POTABLE WATER LINE CONSTRUCTION OF OSMANELIOur still under construction drinking water project consists of the works such as network construction with 85.000 meter PE pipe in 90 – 500 mm diameters, building of 3000 m³ reinforced concrete tank, completing emptying – vacuum lifter and subscriber connections. EMPLOYER İLLER BANKASI GENEL MÜDÜRLÜĞÜ İÇMESUYU DAİRESİ BAŞKANLIĞI /ANKARA [ More → ] |
KARASU 1 AND KARASU 2 BRIDGES OF TATVAN HIGHWAYThe project under construction on Varto Junction– Mus – Tatvan State Highway covers Karasu-1 (right) and Karasu 2 (left) bridges. Bridges built reinforced concrete, and bridge of Karasu 1 is with three spans and 58 meters long and bridge of Karasu 2 is with four spans and 79 meters long. [ More → ] |
CONSTRUCTION OF PAK CITY HOUSING – SULEYMANIYAHOur project started in 2004 and continued currently consists of houses and closed parking lots on totally 187.000 m² construction areas on 68.000 m² land plot. The first 4 stage of the construction is completed and the 5th stage has been still continuing. Pak City with its 4 stages completed in 2010 together with its [...] [ More → ] |
REHABILITATION CENTER OF ARBILOur project still under construction is continuing in Arbil on a constructing area of 42.000 m² and a land plot of 90.000 m² . Project consists of main building including dormitory with 2 floors and living spaces and sport field and visitor buildings. The buildings will be equipped with special security systems and completed in [...] [ More → ] |