CATEGORY » -Infra-Structure Completed Projects
Our completed project consists of works such as totally 3.500 meter transmission line of drinking water through steel pipe in 400 mm diameter, building of elevation centre with five groups, one piece of 5000 m³ reinforced concrete tank, and procurement of pump. 7000 m³ excavation works are realized for the project.